Not as much progress as I'd hoped this weekend. There was a frost last night and the epoxy on all the girder framing did not harden completely overnight. I'm loath to move any of it until it is hard as some of the framing took a lot of bending and may move. I've had some heat on it most of the day and it's geting there now, but it meant I was limited in the jobs I could do. The last two frames requiring doublers (frame 2 and the transom) need wider boards than the stripwood that I've had machined, so I cut several pieces to laminate up. I used an old teak bedslat ! for the transom doubler, to provide a bit more strength for rudder loads etc
0 Comments
Leave a Reply. |
Archives
November 2016
Categories
All
|