Box building frame now finished, although still needs levelling up. After much rescaling from the plans, measuring and careful cutting / positioning all of the vertical frame supports are now built.
1 Comment
Daryl
3/9/2012 06:37:27 pm
How / what method did you use to rescale from the plans?
Reply
Leave a Reply. |
Archives
November 2016
Categories
All
|